Feature

Sample inspection in hours, not days — audit-ready, signed, trilingual.

Your automotive and medical orders hang on the initial sample inspection report — and in most shops it's an Excel-Word patchwork. InjectOS turns it into a process: fully to VDA Volume 2 and PPAP Level 3, from the measurement table to customer approval.

Measurements in, Cpk out.

Up to five readings per characteristic — the system computes mean and Cpk. It pulls the tolerance itself from the DIN 16742 tolerance groups by nominal size. A non-conforming characteristic shows as a traffic light, not a footnote.

Measurements in, Cpk out.
Measurements in, Cpk out.

A balloon plan that thinks along.

Upload the drawing, place balloons — each is linked to its measurement row. Click balloon 7 and row 7 opens. No manual matching, no shifted numbers.

A balloon plan that thinks along.
A balloon plan that thinks along.

Signatures without a printer.

Four digital signatures — operator, quality officer, QM, customer — right in the system. The status chain runs from trial to customer release, and the article only goes to series once released. That's not convenience, that's process assurance.

Signatures without a printer.
Signatures without a printer.

Trilingual by default.

ISIR and trial reports as PDF in German, English and Chinese — for the round trip with the mold maker in Shenzhen.

Trilingual by default.
Trilingual by default.

Trials & gauges included.

Over 50 machine parameters per trial report, re-versioned on every change. Plus gauge management with calibration intervals — from caliper to CMM.

Trials & gauges included.
Trials & gauges included.

Traceability down to the batch.

From the resin lot through the order to the delivery note — forward and backward, in seconds. When the complaint comes, you don't search, you click.

Traceability down to the batch.
Traceability down to the batch.

Q&A

Frequently asked questions

Is this really VDA Volume 2?

Yes — 10 sections, measurement table, function and appearance checks, signatures; PPAP Level 3 is covered.

Can existing reports be migrated?

Historical PDFs attach to the article as documents; new reports are created in the system.

Do we still need a CAQ system?

For sample inspection, trials, gauges and traceability, no. SPC in series is on the roadmap.

Bring a drawing — we'll build the report live.