Production Scheduling
Assign machines by drag & drop. The system flags overlaps, mold conflicts, maintenance windows and shift limits before they become a problem on the floor.
More on schedulingModules
Four disciplines, one database, zero double entry. Every module runs in production at real molders today — pick the area that hurts most first.
Assign machines by drag & drop. The system flags overlaps, mold conflicts, maintenance windows and shift limits before they become a problem on the floor.
More on schedulingInitial sample inspection reports to VDA Volume 2 and PPAP — with automatic Cpk, DIN 16742 tolerances, a clickable balloon plan and digital sign-off. Audit-ready in hours.
More on qualityCalculate with real machine hour rates, request molds worldwide via RFQ, send quotes with approval — and see after the run what you actually earned.
More on sales & costingStore resin by batch and trace it end to end, generate e-invoices (ZUGFeRD/XRechnung, EN 16931), feed DATEV. GoBD-compliant, no rework.
More on inventory & invoicing